To fit the curvature of the parking garage, each of the 400+ panels needed to be a slightly different size, with unique mounting components. Because the installation required drilling into the parking structure, engineering requirements dictated that the panels be cut from aluminum, and safety concerns meant that edges needed to be smooth enough to grab without injury. From startup to completion, the entire project took around four to five weeks. Feedback from all parties was positive: DPR and True Metal Solutions praised the seamless production process, and Phoenix Children’s Hospital received a unique, attractive decorative paneling solution that perfectly met their goals — and was left with more budget to spend on other needs. KorFab, an All Things Metal Brand, is your trusted partner for custom, precision metal fabrication. We are dedicated to our craft and committed to speed, reliability, and your success. If you have a vision, we’re ready to make it happen.